I was so excited to see the result of almost a day of construction involving a great multitude of people that I hurried to see what was going on. I was almost crushed as I was rushed into the new headquarters by what I could only describe as a roaring ocean composed of people from all walks of life. Inside, this is the scene I first saw.
|
The Grand Opening of SWAT, section I |
|
|
The great marble floor has been replaced with black tiles that were devoid of dust. They looked like a natural rock formation with cracks and some wave patterns engraved purposely for that. The front desks were the same but they were more spacious than before. I also realized that the training area was completely revamped. There were several new pieces of furniture in that amount of space. I was first lead into the training area via the waiting room. The entire floor space was covered in the finest wood that echoed against my boots as I walked. I was later told that the wood had been made from trees only without a single bit of other material added, as is most wooden floors these days. On the side are the two black benches you see here, covered with the finest felt. Inside the training room itself, chairs covered with red silk were lined in rows as straight as soldiers do in an Army exercise. A podium was erected using pure bronze shone with prestige and glamor overlooking the red chairs.
|
Dark brown wood, made with 100% natural trees. |
I was then lead to another section of the training area.
No comments:
Post a Comment